{"id":"ops-two-site-productivity-with-and-without-transfer","audience":"executives","category":"operations-work","track":"operations","technique":"verification","level":"advanced","title":"Compare two sites' productivity with a holiday week and a transfer","free":false,"task":"Write a prompt for plain text with exactly four lines: \"Site A:\", \"Site A without transfer:\", \"Site B:\" and \"Check:\". Productivity is units per FTE-day (units / (FTEs x days worked)). Show the math. The Check line says which site is higher on each basis and that the director decides which basis to use. Under 100 words.","materialLabel":"Your material (attached to your prompt automatically)","material":"SITE PRODUCTIVITY - week 47 (units shipped)\n\nSite A (Reno): 120,000 units. 40 FTEs. Worked 4 days (Thursday holiday).\nSite B (Tulsa): 90,000 units. 25 FTEs. Worked 5 days.\n\nSite A's total includes 6,000 units from a one-time transfer of stock out of the closed Fresno site. Without that transfer, Site A shipped 114,000 units.\n\nA board slide draft says: \"Reno ships 120,000 vs Tulsa 90,000, so Reno is 33% more productive.\" The operations director decides which basis (with or without the transfer) to use for reporting.","rules":[{"type":"plainText"},{"type":"maxWords","max":100}],"promptHints":[{"label":"Quotes the four labels","patterns":["site a:","site a without transfer:","site b:","check:"]},{"label":"Gives the formula","patterns":["fte","days worked","units /"]},{"label":"Uses 114,000","patterns":["114,000","without"]},{"label":"Leaves the basis to the director","patterns":["director decides","basis"]},{"label":"Asks for plain text","patterns":["plain","no bold","no markdown","no formatting","no headings"]}],"mistakes":[{"title":"Comparing raw totals","why":"The AI says Reno is 33% more productive.","fix":"Say: \"Productivity = units / (FTEs x days worked).\"","checks":["r1"]},{"title":"Ignoring the transfer","why":"The AI uses 120,000 only.","fix":"Say: \"Add a line for Site A without the 6,000-unit transfer.\"","checks":["r1"]},{"title":"Picking a basis","why":"The AI decides which number to report.","fix":"Say: \"The operations director decides the basis.\"","checks":["r2","r0"]},{"title":"Getting markdown back","why":"AI adds bold, headings and bullets by default, which show up as stray symbols where this is pasted.","fix":"Say \"plain text, no bold, no headings, no asterisks\".","checks":["plainText"]},{"title":"Trusting the AI to count words","why":"AI is bad at counting and usually runs long, so a vague \"keep it short\" lands over the limit.","fix":"Cap each part instead of the total, for example \"each line under 15 words\".","checks":["maxWords"]}],"hint":"Give the productivity formula with days worked, the without-transfer line and what Check must say.","mission":"Compare two sites' productivity with and without the transfer.","musts":["Units per FTE-day","Show the math","Director picks the basis"],"rubricLabels":["There are four lines starting Site A:, Site A without transfer:, Site B: and Check: in that order","Site A shows 120,000 / (40 x 4) = 750, Site A without transfer shows 114,000 / 160 = 712.5, and Site B shows 90,000 / (25 x 5) = 720","Check says Site A is higher with the transfer (750 vs 720) and Site B is higher without it (720 vs 712.5), and that the operations director decides the basis"]}